Latest Software Upgrades

9th June, 2009

1. The home/project/client pages validated for W3C XHTML compliance (Strict). These pages will now typically result in less than 3 errors.

2. Photogallery lightbox replaced with a new version that is more stable in IE7.

3. Minor stability issue with Survey tool fixed.

4. Minor stability issues for very high resolution displays operating IE7 fixed.

5. Added a "Show full description" flag to allow admin to suppress the "read more" link for project descriptions and blog posts.

6. Minor stability issue with display of library folders in IE7 fixed.

7. Added a default image for each project page.

8. Added flexible "drag and drop" reordering of images in the photo gallery.

9. Added flexible "drag and drop" reordering of FAQs.

10. Added all project page "users" to the email distribution list for password protected sites.

11. Added ability for "clients" to edit blog posts at any time.

12. Adjusted library so that the order of documents in the library is the order that they appear on the front page if promoted.

16th April 2009


1. A plethora of performance enhancements to speed up the site.

2. Folders added to the document library.

3. SUMMARY and SNIPPET tags within project, topic and post descriptions to control how much of the text is displayed on the homepage and project pages.

4. Customizable text for in project emails (user activation, forgot password ).

5. Forum, Email and News Tool Names are configurable.

6. Forum summary page can show topic 'Views' instead of 'votes' for each discussion topic.

13th March 2009


1. Replace 'Contact Us' with 'Help' and relevant FAQ text.

2. Amended the text on signup page.

3. Allow Library, FAQs and Key Dates sections to be turned off for a project.

4. Added a delete confirmation step for FAQs and Projects.

5. Library and FAQs are now sortable using drag and drop technology.

6. Video box reformatted.

7. Allow votes to be turned off for discussion topics.

8. Allow page views to replace "votes" for discussion topics.

9. Project description preview length is configurable, defaults to 300 words.

10. Ability to restrict new discussions only to project client.

11. Permit clients to add key links.

12. Disable project delete for clients.

Newsletter signup